When loads get too big for forklifts and too precise for rough handling, teams turn to overhead cranes. This field-tested breakdown takes you behind the scenes of a mega-project crane install. You’ll see hoist and trolley setup—all explained in clear, real-world language.
Bridge Crane Basics
At heart, a bridge crane is a bridge beam that spans between two runway beams, carrying a trolley-mounted hoist for precise, vertical picks. The system delivers three axes of motion: and lift via the hoist.
They’re the backbone of heavy shops and assembly lines, from beam handling to turbine assembly.
Why they matter:
Safe handling of very heavy, unwieldy loads.
Huge efficiency gains.
Lower risk during rigging, lifting, and transport inside facilities.
Support for pipelines, structural steel, and big machinery installs.
Scope at a Glance
Runways & rails: runway girders with crane rail and clips.
End trucks: motorized gearboxes for long-travel.
Bridge girder(s): cambered and pre-wired.
Trolley & hoist: reeving, hook block, upper limit switches.
Electrics & controls: VFDs, radio remote, pendant.
Stops, bumpers & safety: end stops, buffers, travel limits.
Based on design loads and bay geometry, you may be dealing with modest shop lifts or major industrial picks. The installation flow stays similar, but the scale, lift plans, and checks grow with the tonnage.
Before the First Bolt
A clean install is mostly planning. Key steps:
Drawings & submittals: Approve general arrangement (GA), electrical schematics, and loads to the structure.
Permits/JSAs: Job Safety Analysis (JSA) for each lift step.
Runway verification: Survey columns and runway beams for straightness, elevation, and span.
Power readiness: Confirm conductor bars or festoon supports, cable trays, and isolation points.
Staging & laydown: Lay out slings, shackles, spreader bars, and chokers per rigging plan.
People & roles: Brief everyone on radio calls and stop-work authority.
Tiny survey errors balloon into hours of rework. Measure twice, lift once.
Rails & Runways
Runway alignment is the foundation. Targets and checks:
Straightness & elevation: shim packs under clips to meet tolerance.
Gauge (span) & squareness: Use feeler gauges on splice bars, torque rail clips.
End stops & buffers: Install and torque per spec.
Conductor system: Mount conductor bars or festoon track parallel to the rail.
Record as-built readings. Misalignment shows up as crab angle and hot gearboxes—don’t accept it.
Girder Erection & End Trucks
Rigging plan: Choose spreader bars to keep slings clear of electricals. Dedicated signaler on radio.
Sequence:
Install end trucks at staging height to simplify bridge pick.
For double-girder cranes, lift both girders with a matched raise.
Land the bridge on the end trucks and pin/bolt per GA.
Verify camber and bridge square.
Before anyone celebrates, bump-test long-travel motors with temporary power (under permit): confirm limit switch wiring. Re-apply LOTO once checks pass.
Hoist & Trolley
Trolley installation: Mount wheels, align wheel flanges, set side-clearances.
Hoist reeving: Lubricate wire rope; verify dead-end terminations.
Limits & load devices: Set upper/lower limit switches.
Cross-travel adjustment: Align trolley rails on a double-girder.
Pendant/remote: Install pendant festoon or pair radio receiver; function-test deadman and two-step speed controls.
A smooth trolley with a quiet hoist is a sign of good alignment. Fix the mechanics first.
Drive Tuning & Interlocks
Power supply: Drop leads tagged and strain-relieved.
Drive setup: Enable S-curve profiles for precise positioning.
Interlocks & safety: Zone limits near doors or mezzanines.
Cable management: Secure junction boxes; label everything for maintenance.
Commissioning crews love clean labeling and clear folders. If it isn’t documented, it didn’t happen—put it in the databook.
ITP, Checklists, and Sign-Off
Inspection Test Plan (ITP): Hold/witness points for rail alignment, torque, electrical polarity, limit settings.
Torque logs: Record wrench serials and values.
Level & gauge reports: Attach survey prints.
Motor rotation & phasing: Document bump tests.
Functional tests: Jog commands, inching speeds, limits, overloads, pendant/remote range.
QA/QC is not paperwork—it’s your warranty in a binder.
Load Testing & Commissioning
Static load test: Hold at mid-span and near end stops; monitor deflection and brake performance.
Dynamic load test: Check sway, braking distances, and VFD fault logs.
Operational checks: Limit switches trigger reliably; overload trips; horn/beacon function.
Training & handover: Maintenance intervals for rope, brakes, and gearboxes.
When the logbook is clean, the crane is officially in service.
Everyday Heavy Lifting
Construction & steel erection: placing beams, trusses, and precast.
Oil & gas & power: moving heavy pumps, skids, and pipe spools.
Steel mills & foundries: hot metal handling (with the right duty class).
Warehousing & logistics: high throughput lanes.
Floor stays clear, production keeps flowing, and precision goes up.
Safety & Engineering Considerations
Rigging discipline: dedicated signaler and stop-work authority.
Lockout/Tagout: test before touch every time.
Fall protection & edges: scissor lifts and manlifts inspected.
Runway integrity: regular runway inspection plan.
Duty class selection: match crane class to cycles and loads.
Safety isn’t a stage—it's the whole show.
If It Doesn’t Run Smooth
Crab angle/drift: re-check runway gauge and wheel alignment.
Hot gearboxes: adjust brake air gap and reduce VFD decel.
Rope drum spooling: dress rope and reset lower limit.
Pendant lag or dropout: antenna placement for radio; inspect festoon collectors.
Wheel wear & rail pitting: lubrication and alignment issues.
Little noises are messages—listen early.
FAQ Snippets
Overhead vs. gantry? Bridge cranes ride fixed runways; gantries walk on the floor.
Single vs. double girder? Span and duty masterformat class usually decide.
How long does install take? Scope, bay readiness, and tonnage rule the schedule.
What’s the duty class? FEM/ISO or CMAA classes define cycles and service—don’t guess; size it right.
Who Gets the Most Value
Students and pros alike get a front-row seat to precision rigging, structural alignment, and commissioning. You’ll see how small alignment wins become big reliability wins.
Want ready-to-use checklists for runway surveys, torque logs, and load-test plans?
Get the toolkit now so your next crane goes in cleaner, faster, and right the first time. Save it to your site tablet for quick reference.
...